1. Clear and clean the sharp objects such as iron on the berth to avoid scratching the Marine airbag and causing unnecessary losses.
2. Place the Marine airbags at the bottom of the ship at a predetermined distance and inflate it. Obact the rising state of the ship and the pressure of the air bag at any time.
3. After inflating all Marine airbags, check the state of the air bags again, check whether the ship is balanced, and check whether the berth is clean and tidy.
4. The most important thing for the ship to use the air bag to launch is the stern first, and the stern first introduces the water surface; If it had gone the other way, the propeller at the back of the boat would have scraped the air bag, causing a safety accident.
Diameter |
Layer |
Working pressure |
Working height |
Guaranteed bearing capacity per unit length(T/M) |
D=1.0m |
6-8 |
0.18MPa-0.22MPa |
0.5m-0.8m |
≥13.7 |
D=1.2m |
6-8 |
0.17MPa-0.2MPa |
0.6m-1.0m |
≥16.34 |
D=1.5m |
6-8 |
0.16Mpa-0.18MPa |
0.7m-1.2m |
≥18 |
D=1.8m |
6-10 |
0.15MPa-0.18MPa |
0.7m-1.5m |
≥20 |
D=2.0m |
8-12 |
0.17MPa-0.2MPa |
0.9m-1.7m |
≥21.6 |
D=2.5m |
8-12 |
0.16MPa-0.19MPa |
1.0m-2.0m |
≥23 |
Size |
Diameter |
1.0m,1.2m,1.5m,1.8m,2.0m,2.5m,2.8m,3.0m |
Effective Length |
8m, 10m,12m,15m,16m, 18m,20m,22m,24m,Etc. |
|
Layer |
4layer,5layer,6layer,8layer,10layer,12layer |
|
Remark: |
According to different launching requirements, different ship types and different ship weights, the slope ratio of berth is different, and the size of Marine airbag is different.
If there are special requirements, can be customized. |